Learmonth Terrace time lapse

Whilst working at Four by Two, we set up a time-lapse camera on site to capture the construction of a zinc clad extension. The extension was part of a larger refurbishment works, finished to a high standard and designed by Ben Ingle at Curve Architecture. I detailed the technical elements of the extension and oversaw the work on site, coordinating the steel structure, roof lights, doors and zinc cladding. The internal reveal of the 'goal post' design was clad in corten steel, designed to rust as it weathers.

Finished photos coming soon